Next Main Wall Reset: 4th to 8th September

  • Roof lines will be stripped and reset from the 4th to 8th September. During the daytime the entire area under the main overhang will be closed for climbing (lines 70 through to 105), then during the evening the side walls will be open again for people to climb on.
  • The rest of the centre will be open to the general public as usual.